Document Equation

Document Table of Contents

Document Equation

Writing Equation 

Historiography Physics

Hebrew 8 Layer Disks

 

This is where things become interesting.

For at this point, instead of working with just one single x line say Mid Winter or Yule.

You have 8 calendars working together; so you have 8 layers of lines.

Those 8 lines of characters in a line. Not unlike music at all.

 

Each in effect Bar (octave) can and will create different letters.

For Example 2021 May 20

 

Yule

Yule Year 

XL DTTS

Days

149

Month

D

Day

F

Imbulc

Imbulc Year

XL DTTS

Days

109

Month

F

Day

I

Easter

Easter Year

XL DTTS

Days

61

Month

B

Day

TH

Beltain

Beltain Year

XL DTTS

Days

22

Month

Al

Day

W

Litha

Litha Year

XL DTTS

Days

330

Month

J

Day

 U

Lughnasad

Lughnasad Year

XL DTTS

Days

290

Month

H

Day

K

Mabon

Mabon Year 

XL DTTS

Days

239

Month

K

Day

F

Samhain

Samhain Year

XL DTTS

Days

205

Month

TH

Day

G

 

 

From those 8 bars, you will have 4 primiry letters on an x line.

Now you have 8 x lines or music bar/octaves of characters.

 

Score of bars 1-3 showing the octave jump down (Jump: A) in bar 1 and... |  Download Scientific Diagram

So you have 8 bars/lies which allow for large collections of letters, at least 4 left to right.

And 8 top to bottom.

Or 8 from the current primary calendar now, with the one up being the last primary, 2 up being the previous to the last primary, 3 up would be 3 back.

One down from the main line would be the next primary month

2 down the one after next

3 down would be the one after that.

The end would be up till half way of that year, it is forward, or down. after its 181 days it will be the 4th up being the 4th back. About that time the current prime will become the last and the next will become prime.

A close-up of a map

Description automatically generated with low confidence

Previous To the Current

Situations and People who Led to the Construction

Construction Pre Production

Construction Begins

Construction Progression and Details

How Long since Construction Ended

Events of the Structure since Construction Ended

Building Modifications

Current Configuration

 

People Involved

Location Involved

UNESCO

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

zz

 

 

Elder Futhark

References

TR Welling